Monday, December 8, 2014
How to view EQUIPMENT ID & EQUIPMENT MASTER DATA in SAP?
Labels:
ERP PM Module
Took VRS while working as Asst. General Manager in BSNL. Passionate in driving and exploring the places with historic, religious and cultural importance
Tuesday, December 2, 2014
FAQ on Posting date ERROR
Very frequently, our friends are stuck up at an posting error issued by the system.
Error description:
Error description:
Posting only possible in periods 2014/08 and 2014/07 in company code 1053
Normally, this will happen if the posting period is not OPEN, while posting MIGO/SES etc.
Here, thing to understand is:
2014 = Indicates Financial year i.e., currently 2014-15
01 = April; 02 = May; 03 = June and so on...12 = March
Company code = 1053 (STR) will differ according to USER's circle
So, now an user can conclude that system will accept posting between 01-10-2014 (2014/07) to 30-11-2014 (2014/08) only.
When this type of ERROR occurs, user has two options:
(i) Wait for the period to OPEN
or
(ii) Input a posting date between the mentioned period.
There are two types of posting periods:
(i) MM period which will normally be kept OPEN for a current month and previous month.
(ii) FI period which will normally be kept OPEN for current month only.
Labels:
ERP MM Module
Took VRS while working as Asst. General Manager in BSNL. Passionate in driving and exploring the places with historic, religious and cultural importance
Friday, November 14, 2014
PR creation linking to a Maintenance Order (for Materials) - On-line request for expenditure approval through SAP
A Purchase Requisition is required when
expenditure involves approval of the competent authority. PR can be made for
Material or Services. Also, a PR can be created directly by using T-code: ME51N
(or) through a Maintenance Order to affect the expenditure against a particular
equipment.
Here, there will be two types of scenarios:
Case 1:
When USER wants to
bring the material into inventory and consume at a later date:
1. User can follow below published
procedure as it is.
While creating PO, after adopting PR, ensure Account Assignment
category (A) field is BLANK. (By default, “F” will be picked-up from PR. “F” is
to be deleted.)
Case 2:
When USER doesn’t
want to bring the material into inventory and wish to consume directly:
1.
While creating MO, don’t fill material
code under COMPONENTS tab.
2. Para
3(a) of below published process is to be omitted.
3. Para 14 of below published process is to be read as:
“After P.O. is created and approved by the competent authority, user has to execute MIGO (Goods Receipt) with reference to P.O.”
In this case, material will not be received into the Storage Location.
4. Para 15 of below published process is to be omitted.
“After P.O. is created and approved by the competent authority, user has to execute MIGO (Goods Receipt) with reference to P.O.”
In this case, material will not be received into the Storage Location.
Labels:
ERP MM Module,
ERP PM Module
Took VRS while working as Asst. General Manager in BSNL. Passionate in driving and exploring the places with historic, religious and cultural importance
Monday, November 10, 2014
PR creation through a Maintenance Order (for External Services) - On-line request for expenditure approval through SAP
A Purchase Requisition is required when expenditure involves approval of the competent authority. PR can be made for Material or Services. Also, a PR can be created directly by using T-code: ME51N (or) through a Maintenance Order to affect the expenditure against a particular equipment.
This page I will describe creation of PR through a Maintenance Order for External Services.
Labels:
ERP MM Module
Took VRS while working as Asst. General Manager in BSNL. Passionate in driving and exploring the places with historic, religious and cultural importance
Monday, November 3, 2014
How to create a Maintenance Order with a Past Date?
Labels:
ERP PM Module
Took VRS while working as Asst. General Manager in BSNL. Passionate in driving and exploring the places with historic, religious and cultural importance
Steps on Linking a Maintenance Order during temporary advance settlement
Labels:
ERP FICO Module,
ERP PM Module
Took VRS while working as Asst. General Manager in BSNL. Passionate in driving and exploring the places with historic, religious and cultural importance
Saturday, November 1, 2014
End user manual for Service Entry Sheet (SES) creation
Labels:
ERP MM Module
Took VRS while working as Asst. General Manager in BSNL. Passionate in driving and exploring the places with historic, religious and cultural importance
End User manual for PM Breakdown Maintenance (Other than STR users)
Labels:
ERP PM Module
Took VRS while working as Asst. General Manager in BSNL. Passionate in driving and exploring the places with historic, religious and cultural importance
End user manual for temporary advance request, approval, settlement
Labels:
ERP FICO Module
Took VRS while working as Asst. General Manager in BSNL. Passionate in driving and exploring the places with historic, religious and cultural importance
Subscribe to:
Posts (Atom)